Blog

The 70’s Called, They Want Their Load Bank Back

Posted on March 8, 2022 by Josie Krugerud — 2 Comments Category: Facility & Capabilities The air-cooled test bay has been an important piece of equipment for many years. All of our portables and small air-cooled standby generators pass through for their 100% load tests. After many years and thousands of units, it was time…
Read more

A record number of people are buying generators—here’s why to consider one

Power outages can happen in an instant and without any warning. Not only are they inconvenient, but outages can pose danger when critical appliances aren't available to use such as heating and cooling systems, refrigerators and medical gear like CPAP machines. With increasingly severe weather on the rise, along with aging utility infrastructure, power outages…
Read more

Three Phase Portable Power

Our WL12000HE has been designed to produce three-phase power! Three-phase output stays constant, with each leg of alternating current separated by 1/3 of the time in a full cycle. We created three 3-PH models available in:120/208V132/230V277/480V I know what you are thinking.. “It’s about time!” Plug IncludedThese units use less common plugs, we included one…
Read more

Are you ready for Redi Power?

Our engineering team has been working hard to complete the new RP line. This year, we will be showcasing some of these RP units at the PowerGen 2022. Features We made sure our RP units are equipped with everything you would need and then some! Fiat Tier-IV Final EngineIndustrial Stamford Gen EndLess than 50HPLess registration…
Read more